OLYMPUS Series Height Adjustable Key Pad Quick Guide SETTING 4 OLYMPUS SETTING 3 UP SETTING 2 SETTING 1 M DISPLAY DOWN Initial Start Up - Calibration. (MUST BE PERFORMED AFTER ASSEMBLY) After desk is plugged into power, follow these steps; 1. Press and hold M + UP button (at the same time) for 4 seconds. 2. Display will change to “SET” 3. Let go of M + UP button and the desk will start the calibration procedure automatically Note: Desk will first go down to the lowest position, then up to the highest position. Once complete it will stop in between. 4. Once calibration is complete, the desk is ready to use. Note: If desk is disassembled, moved, changed or will not go up or down, perform the above steps again. Basic Key Pad Operation 1. Press and hold the UP button for desired height. 2. Press and hold the DOWN button for desired height. Setting Quick Access Preset Height Buttons 1. Press the UP and DOWN buttons to attain the desired height for preset button. 2. Press and hold M button until you see SET displayed. Caution: • Saved height presets will not be lost in the event of a power outage. • The lowest position is 70cm (display will read 070). • Do not exceed recommended weight limit of 100kg (220lbs). • Install with 2.5cm (1”) clearance around work surface to prevent finger pinch. • Ensure vertical motion is clear of obstruction. QUESTIONS OR CONCERNS? Please contact Customer Service T 1-800-567-3060 M-F 6am - 4:30 pm PST [email protected] January 17, 2017 REV B 3. Press one of the four SETTING buttons to add as a memorized preset desk height. Séries OLYMPUS Guide pratique des touches réglables en hauteur RÉGLAGE 4 OLYMPUS RÉGLAGE 3 TOUCHE VERS LE HAUT RÉGLAGE 2 RÉGLAGE 1 AFFICHAGE NUMÉRIQUE M Phase initiale de démarrage – Étalonnage (DOIT ÊTRE EFFECTUÉ APRÈS L’ASSEMBLAGE) TOUCHE VERS LE BAS Une fois le bureau branché dans une prise de courant, suivre les étapes suivantes: 1. Peser et tenir les commandes M + Touche vers le haut (en même temps) pendant 4 secondes. 2. Le régulateur affichera (SET) 3. Relâcher les commandes M + Touche vers le haut et l’étape d’étalonnage du bureau commencera automatiquement. À noter: Le bureau descendra vers la position la plus basse, ensuite vers la position la plus haute. Une fois l’initialisation complétée il arrêtera entre les deux. 4. Une fois l’initialisation complétée, le bureau est prêt à utiliser. À noter: Si le bureau est démonté, déplacé ou modifié ou s’il ne monte ou ne se baisse pas, répéter de nouveau les étapes ci-haut. Opération de base des touches 1. Peser et tenir la touche vers le HAUT pour la hauteur désirée. 2. Peser et tenir la touche vers le BAS pour la hauteur désirée. Application de l’accès rapide aux touches programmables 1. Peser sur les touches du HAUT et du BAS pour régler la hauteur désirée de la touche programmable. 2. Peser et tenir la touche M, jusqu’à ce que le mot SET soit affiché. 3. Peser sur une des quatre touches de réglage pour ajouter en mémoire la hauteur désirée programmable du bureau. Mise en garde: • Les hauteurs programmées et sauvegardées ne seront pas perdues en cas de panne d’électricité. • La position la plus basse est de 70cm (sera affichée comme 070). • Ne pas dépasser la limite de poids recommandée de 100kg (220 lbs). • Installer le bureau avec autour un espace dégagé de 2,5cm, afin de prévenir le pincement des doigts. • S’assurer que la motion verticale est libre de toute obstruction. QUESTIONS OU PRÉOCCUPATIONS? COMMUNIQUER avec le Service à la clientèle Tél: 1-800-567-3060 du lundi au vendredi entre 6h00 et 16h30 (Heure Normale du Pacique HNP) [email protected] 17 janvier 2017, RÈV B Model: OLY-E1-2LEG Modèle: OLY-E1-2LEG OLYMPUS Assembly Instruction Guide D’Assemblage QUESTIONS OR CONCERNS? PHONE Customer Service 1-800-567-3060 M-F 6am - 4:30 pm PST 1 of 10 ENTIO TT N A QUESTIONS OU PRÉOCCUPATIONS? COMMUNIQUER avec le Service à la clientèle Tél: 1-800-567-3060 du lundi au vendredi entre 6h00 et 16h30 (Heure Normale du Pacifique HNP) IMPORTANT! BEFORE PLUGGING INTO POWER SEE QUICK GUIDE FOR UNIT SETUP, CALIBRATION AND KEY PAD OPERATION. AVIS IMPORTANT! AVANT DE BRANCHER À UNE PRISE DE COURANT, CONSULTER LE GUIDE DE RÉFÉRENCE RAPIDE DE MONTAGE, D’ÉTALONNAGE ET D’OPÉRATION DE BASE DES TOUCHES. FEBRUARY 8, 2017, REV C 1 de 10 LE 8 FÉVRIER, 2017, RÉV B PARTS:/LISTE DES PIÈCES: 2 of 10 FEBRUARY 8, 2017, REV C 1. LEG FOOT/PIÈTEMENT 2. LEFT LEG COLUMN/COLONNE DE LEVAGE GAUCHE 3. SIDE CHANNELS/CONDUIT DE CÂBLE LATÉRAL 4. LEG TOP PLATE/BRAS EN PORTE À FAUX 5. DESK TOP/DESSUS DU BUREAU 6. FRONT CENTER CHANNEL/CONDUIT DE CÂBLE (DEVANT – CENTRE) 7. REAR CENTER CHANNEL/CONDUIT DE CÂBLE (ARRIÈRE – CENTRE) 8. POWER CABLE/CÂBLE D’ALIMENTATION 9. MOTOR/MOTEUR 10. CONTROL BOX/BOÎTE DE CONTRÔLE 11. HEX DRIVE SHAFT/TIGE D’EN TRAÎNEMENT HEXAGONALE 12. CONTROL BOX SHELF/SUPPORT DE LA BOÎTE DE CONTRÔLE 13. KEY PAD/PANNEAU DE COMMANDE RÉGLABLE 14. ADJUSTABLE HEX DRIVE SHAFTS/TIGE D’ENTRAÎNEMENT HEXAGONALE AJUSTABLE 15. RIGHT LEG COLUMN/COLONNE DE LEVAGE DROITE 16. JUMPER CABLE/CÂBLE DE RACCORDEMENT 2 de 10 LE 8 FÉVRIER, 2017, RÉV B HARDWARE/QUINCAILLERIE: 3 of 10 FEBRUARY 8, 2017, REV C 3 de 10 LE 8 FÉVRIER, 2017, RÉV B A ENTIO TT N STEP 1 ÉTAPE 1 ENSURE LEG LEFT AND RIGHT LEG COLUMNS ARE INSTALLED CORRECTLY. S’ASSURER QUE LES COLONNES DE DROITE ET DE GAUCHE SONT INSTALLÉES CORRECTEMENT. NOTE: IF YOU ARE ASSEMBLING THIS PRODUCT FOR USE WITH A 48” WIDE TOP, PLEASE CALL CUSTOMER SERVICE AT 1-800-567-3060. À NOTER: S.V.P. TÉLÉPHONER AU SERVICE A LA CLIENTÈLE AU 1-800-567-3060 SI VOUS ASSEMBLEZ CE PRODUIT POUR USAGE AVEC UN DESSUS DE BUREAU DE 48”. 4 of 10 FEBRUARY 8, 2017, REV C 4 de 10 LE 8 FÉVRIER, 2017, RÉV B STEP 2 ÉTAPE 2 (OUVERT) 5 of 10 FEBRUARY 8, 2017, REV C (FERMÉ) 5 de 10 LE 8 FÉVRIER, 2017, RÉV B STEP 3 ÉTAPE 3 6 of 10 FEBRUARY 8, 2017, REV C 6 de 10 LE 8 FÉVRIER, 2017, RÉV B STEP 4 ÉTAPE 4 7 of 10 FEBRUARY 8, 2017, REV C 7 de 10 LE 8 FÉVRIER, 2017, RÉV B STEP 5 ÉTAPE 5 8 of 10 FEBRUARY 8, 2017, REV C 8 de 10 LE 8 FÉVRIER, 2017, RÉV B STEP 6 ÉTAPE 6 9 of 10 FEBRUARY 8, 2017, REV C 9 de 10 LE 8 FÉVRIER, 2017, RÉV B 10 of 10 A ENTIO TT N STEP 7 ÉTAPE 7 IMPORTANT! BEFORE PLUGGING INTO POWER SEE QUICK GUIDE FOR UNIT SETUP, CALIBRATION AND KEY PAD OPERATION. AVIS IMPORTANT! AVANT DE BRANCHER À UNE PRISE DE COURANT, CONSULTER LE GUIDE DE RÉFÉRENCE RAPIDE DE MONTAGE, D’ÉTALONNAGE ET D’OPÉRATION DE BASE DES TOUCHES. FEBRUARY 8, 2017, REV C 10 de 10 LE 8 FÉVRIER, 2017, RÉV B ">
Public link updated
The public link to your chat has been updated.