NOTICE TECHNIQUE 2023-09 TECHNICAL SHEET 2023-09 zaza2 pbt Brevet deposé N°1558856 / patent depost POUR TYROLIENNE for ZIP LINE AVANTAGES/ ADVANTAGES 1x + 80M Facile et simple à installer Easy to install Sans SERRE-CÂBLE! No CLAMP Réglage de tension rapide Quick adjustment Sans maintenance No maintenace + 400M Safety Line /Ligne de vie : ø 12 mm or 1/2 " CT/WLL 30kN x1 ZAZA2 PBT Galvanized steel wire rope with metal core / Câble acier galvanisé avec âme métalique :- 7x19 -Non rotating wire rope / Anti-giratoire -6x26 Swaged/ Compacté For any other type: do tests Pour tout autre type : Faire des tests NO ! STANDARDS MANILLE LYRE BOW SCHACKLE HR 4T75 - HS 3/4" ACCT OK x1 x1 EN 15567-1 EN13411-3 ACIER INOXYDABLE STAINLESS STEEL INOX 316 L x2 N16 - 5/8" CT/WLL: 2900 Kg GO12 - LO1/2" CT/WLL:1250 Kg EXEMPLES DE FIXATIONS (liste non-exhaustive) / FIXATION EXAMPLE (non-exhaustive list) ELINGUE DE LEVAGE RONDE TEXTILE TYPE "E" CMU mini 3 tonnes ROUND TEXTILE SLING FOR LIFTING TYPE "E" WLL mini 3 tons NORMES : EN 13411-1/7 STANDARDS: OK ! CÂBLES ø12 or 1/2" ÂME METALLIQUE METALLIC CORE COSSE-COEUR / THIMBLE Chain HR/HS Ø 10/13 mm Grade 80 mini La CMU des fixations doit être correctement dimensionnée / WLL of the fixing element must be correctly sized Une platine de tyrolienne doit impérativement être montée avec une platine backup A zipline plate must be fitted with a backup plate. Operation 1 MANILLE LYRE / BOW SCHACKLE x1 = HR 4T75 - HS 3/4" 1 2 3 NORMES DE MONTAGE STANDARDS ASSEMBLIES 4 EN 15567-1 EN 13411-1/7 STANDARDS - ACCT 4 positions Operation 2 PLAQUE DE GUIDAGE GUIDING PLATE a2 = x1 = N 16 or 5/8" a1 = x2 = GO 12 - LO 1/2" OK NO ! COSSE-COEUR / THIMBLE OK ! a3 = 4 x 130kN Operation 3 DEPART DE LA TYROLIENNE : INSTALLATION DU CÂBLE = SANS PLATINE START ZIP LINE: CABLE INSTALLATION= NO PLATE CROCHET À ÉMERILLON HR 4T75 - HS 3/4" SWIVEL SAFETY HOOK CT/WLL >= 2T N16 or 5/8" = Pour la tension du câble For tension of cable 360° = Possible rotation du câble possible rotation of cable EMERILLON = SWIVEL Operation 4 ARRIVEE DE LA TYROLIENNE : INSTALLATION DE LA PLATINE ARRIVAL ZIP LINE:PLATE INSTALLATION 1 2 4 3 =1 : PREMIERE POSITION FIRST POSITION OK ! COSSE-COEUR / THIMBLE Operation 5 TENSION MAX MAX TENSION TENSION DU CÂBLE CABLE TENSION SION TEN L DE OUTI ON TI TRAC ION RACT TOOL OF T Operation 6 POUR SERTIR TO CRIMP 1 2 = 1 x 130kN = 12mm Couper le brin mort Cut the dead end rope 3 4 x 130kN 130kN) Operation 7 DEPART DE LA TYROLIENNE : INSTALLATION DE LA PLATINE START ZIP LINE : PLATE INSTALLATION 1 2 =1 : PREMIERE POSITION FIRST POSITION 3 4 = a3 Operation 8 AJUSTER LA TENSION DU CÂBLE ADJUST the CABLE TENSION PLATINE DE DEPART DE LA TYROLIENNE ZIP LINE STARTING PLATE 1 • A AJUSTER EN PREMIER FIRST ADJUSTEMENT 1 2 2 3 2 34 3 4 4 PLATINE D'ARRIVEE DE LA TYROLIENNE ZIP LINE ARRIVAL PLATE • A AJUSTER EN DERNIER LAST ADJUSTEMENT 4 3 4 2 3 1 2 Operation 9 RECOMMANDATION DE MONTAGE RECOMENDATION OF ASSEMBLY CHARGE MAX= 2000 daN MAX LOAD = TENSION SOUPLE FLEXIBLE TENSION Rappel /Reminder: Operation 10 JONCTION JUNCTION Exemples (non contractuel) de systèmes de fixations Alternative example and suggestion for fixation ">

Link público atualizado
O link público para o seu chat foi atualizado.