NOTICE TECHNIQUE 2023-09 TECHNICAL SHEET 2023-09 zaza2 pbt Brevet deposé N°1558856 / patent depost POUR TYROLIENNE for ZIP LINE AVANTAGES/ ADVANTAGES 1x + 80M Facile et simple à installer Easy to install Sans SERRE-CÂBLE! No CLAMP Réglage de tension rapide Quick adjustment Sans maintenance No maintenace + 400M Safety Line /Ligne de vie : ø 12 mm or 1/2 " CT/WLL 30kN x1 ZAZA2 PBT Galvanized steel wire rope with metal core / Câble acier galvanisé avec âme métalique :- 7x19 -Non rotating wire rope / Anti-giratoire -6x26 Swaged/ Compacté For any other type: do tests Pour tout autre type : Faire des tests NO ! STANDARDS MANILLE LYRE BOW SCHACKLE HR 4T75 - HS 3/4" ACCT OK x1 x1 EN 15567-1 EN13411-3 ACIER INOXYDABLE STAINLESS STEEL INOX 316 L x2 N16 - 5/8" CT/WLL: 2900 Kg GO12 - LO1/2" CT/WLL:1250 Kg EXEMPLES DE FIXATIONS (liste non-exhaustive) / FIXATION EXAMPLE (non-exhaustive list) ELINGUE DE LEVAGE RONDE TEXTILE TYPE "E" CMU mini 3 tonnes ROUND TEXTILE SLING FOR LIFTING TYPE "E" WLL mini 3 tons NORMES : EN 13411-1/7 STANDARDS: OK ! CÂBLES ø12 or 1/2" ÂME METALLIQUE METALLIC CORE COSSE-COEUR / THIMBLE Chain HR/HS Ø 10/13 mm Grade 80 mini La CMU des fixations doit être correctement dimensionnée / WLL of the fixing element must be correctly sized Une platine de tyrolienne doit impérativement être montée avec une platine backup A zipline plate must be fitted with a backup plate. Operation 1 MANILLE LYRE / BOW SCHACKLE x1 = HR 4T75 - HS 3/4" 1 2 3 NORMES DE MONTAGE STANDARDS ASSEMBLIES 4 EN 15567-1 EN 13411-1/7 STANDARDS - ACCT 4 positions Operation 2 PLAQUE DE GUIDAGE GUIDING PLATE a2 = x1 = N 16 or 5/8" a1 = x2 = GO 12 - LO 1/2" OK NO ! COSSE-COEUR / THIMBLE OK ! a3 = 4 x 130kN Operation 3 DEPART DE LA TYROLIENNE : INSTALLATION DU CÂBLE = SANS PLATINE START ZIP LINE: CABLE INSTALLATION= NO PLATE CROCHET À ÉMERILLON HR 4T75 - HS 3/4" SWIVEL SAFETY HOOK CT/WLL >= 2T N16 or 5/8" = Pour la tension du câble For tension of cable 360° = Possible rotation du câble possible rotation of cable EMERILLON = SWIVEL Operation 4 ARRIVEE DE LA TYROLIENNE : INSTALLATION DE LA PLATINE ARRIVAL ZIP LINE:PLATE INSTALLATION 1 2 4 3 =1 : PREMIERE POSITION FIRST POSITION OK ! COSSE-COEUR / THIMBLE Operation 5 TENSION MAX MAX TENSION TENSION DU CÂBLE CABLE TENSION SION TEN L DE OUTI ON TI TRAC ION RACT TOOL OF T Operation 6 POUR SERTIR TO CRIMP 1 2 = 1 x 130kN = 12mm Couper le brin mort Cut the dead end rope 3 4 x 130kN 130kN) Operation 7 DEPART DE LA TYROLIENNE : INSTALLATION DE LA PLATINE START ZIP LINE : PLATE INSTALLATION 1 2 =1 : PREMIERE POSITION FIRST POSITION 3 4 = a3 Operation 8 AJUSTER LA TENSION DU CÂBLE ADJUST the CABLE TENSION PLATINE DE DEPART DE LA TYROLIENNE ZIP LINE STARTING PLATE 1 • A AJUSTER EN PREMIER FIRST ADJUSTEMENT 1 2 2 3 2 34 3 4 4 PLATINE D'ARRIVEE DE LA TYROLIENNE ZIP LINE ARRIVAL PLATE • A AJUSTER EN DERNIER LAST ADJUSTEMENT 4 3 4 2 3 1 2 Operation 9 RECOMMANDATION DE MONTAGE RECOMENDATION OF ASSEMBLY CHARGE MAX= 2000 daN MAX LOAD = TENSION SOUPLE FLEXIBLE TENSION Rappel /Reminder: Operation 10 JONCTION JUNCTION Exemples (non contractuel) de systèmes de fixations Alternative example and suggestion for fixation ">
/
Herunterladen
Nur eine freundliche Erinnerung. Sie können das Dokument direkt hier ansehen. Aber was am wichtigsten ist, unsere KI hat es bereits gelesen. Sie kann komplexe Dinge einfach erklären, Ihre Fragen in jeder Sprache beantworten und Ihnen helfen, auch in den längsten oder kompliziertesten Dokumenten schnell zu navigieren.